Install the cache module in the SAS cache module connector on the system board. For connector
5.
locations, see "System board components (on page 11)."
Install the PCI riser board assembly (on page 25).
6.
Install the access panel (on page 22).
7.
Slide the server into the rack.
8.
Power up the server (on page 20).
9.

Installing the BBWC battery pack

Power down the server (on page 20).
1.
Extend the server from the rack (on page 20).
2.
Remove the access panel (on page 22).
3.
Remove the PCI riser board assembly (on page 24).
4.
Install the cache module
5.
Install the BBWC battery pack.
6.
("Installing the cache
module" on page 57).
Hardware options installation 58