Product Unpacking / Inspection / Storage / Disposal; Unpack The Premium 15/25/30 Kva Ups (With Casters) - Toshiba 4200FA Installation And Operation Manual

Three-phase 15/25/30/50 kva ups
Hide thumbs Also See for 4200FA:
Table of Contents

Advertisement

2.0

Product Unpacking / Inspection / Storage / Disposal

2.1

Unpack the Premium 15/25/30 kVA UPS (with Casters)

(EXCLUDING Seismic and Base versions – See 2.2)
Carefully inspect the UPS for shipping damage. Units shipped within North America and NAFTA are shrink
wrapped.
2. Unbolt the rails from both the unit
and the shipping pallet.
Place the rails on the front of
the pallet.
Use the four 1/2 x 3" bolts to
secure the rails to the shipping
pallet.
Attach the rails as shown to the
front of the pallet.
DANGER
10
1. Remove shrink wrap.
TOP HEAVY EQUIPMENT. IMPROPER LIFTING CAN RESULT IN INJURY OR
DEATH. LIFT AND MOVE CAREFULLY AND ONLY WITH ADEQUATE
EQUIPMENT AND TRAINED PERSONNEL. THIS EQUIPMENT WILL TIP OVER
EASILY UNTIL FIXED IN PLACE.
4200FA Installation and Operation Manual
3. Place the tie brackets in the slots at
the lower end of the ramps.
SLOWLY roll the unit down the
ramp.
4. Save the loading rails for seismic
anchoring of the UPS. See pg. 14.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4200fa ct

Table of Contents