Protection Panels; Ac Power Turnup; Rectifier; Battery - ADTRAN Total Access Fiber Node Cabinet System Manual

Table of Contents

Advertisement

Protection Panels

For information refer to the following:
Protection Panels
on page 13.
• MESA Sport NT on Riser: Section 5.3 under Marconi FNC (640-205-001)
7. Protection panels wired
8. Protectors properly grounded at MDF or relay racks
9. Protection devices in place prior to service deployment

AC Power Turnup

For information refer to the following:
Power Turnup
on page 16.
• MESA Sport NT on Riser: Section 4 under Marconi FNC (640-205-001)
10. AC service installed
11. AC ground system installed
12. Wire the main AC breaker
13. Proper AC disconnect installed
14. Fuse Loading, refer to the fuse loading table located inside Bay 2 door

Rectifier

For information refer to the following:
Turnup and Test Rectifier
• Valere Power System Manual
15. Turnup and test rectifier

Battery

For information refer to the following:
Battery Installation and Test
• Tyco Electronics VRLA Battery Manual
16. Battery installed and tested
17. Ground leads properly secured. Two hole lugs on all ground bar connections

Battery Warming

18. Battery warming system is wired correctly
64192MS3KQL1-1A
on page 17.
on page 18.
Fiber Node Cabinet System Manual
Initial
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
Date
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
23

Advertisement

Table of Contents
loading

Table of Contents