Battery Compartment; Network Management Overview; Cabinet Specifications; Shipping Weight - ADTRAN Total Access Fiber Node Cabinet System Manual

Table of Contents

Advertisement

Fiber Node Cabinet System Manual

Battery Compartment

The isolated battery compartment under the equipment chamber is accessed by opening the front or back
door to expose the battery access panel hold down bolts. After removing these bolts the access panel can be
lifted away exposing the battery trays. Batteries are mounted on two heavy duty stationary trays installed
one above the other. Adjacent to the battery compartment are the various grommets and cable sleeve cones
and nozzles for cabinet wiring ingress.

Network Management Overview

Management of the SONET (synchronous optical network) system itself for Operation, Administration,
Maintenance, and Provisioning (OAM&P) is accomplished through the capabilities of the ADTRAN OC-3
and STS-1 multiplexer.

Cabinet Specifications

Refer to Marconi Document 640-205-001, Section 2.4, Cabinet Dimensions, for a detailed list of cabinet
dimensions and specifications.

Shipping Weight

The cabinet shipping weight minus the batteries is 700 lb. (317 kg.) The shipping weight of the cabinet
includes the cabinet and shipping pallet, the electronic equipment, power devices, fuse and alarm panels,
and the cross connect and protect panels.
Batteries are not included with the system and must be separately
purchased by the customer. For information on battery installation proce-
dures, refer to
6
NOTE
Battery Installation and Test
on page 18.
64192MS3KQL1-1A

Advertisement

Table of Contents
loading

Table of Contents