Fiber Node Cabinet
System Manual
Manual Part Number - 64192MS3KQL1-1A
CD Part Number - 32536204@A
64192MS3KQL1-1A
June 2004

Advertisement

Table of Contents
loading

Summary of Contents for ADTRAN Total Access Fiber Node Cabinet

  • Page 1 ® Fiber Node Cabinet System Manual Manual Part Number - 64192MS3KQL1-1A CD Part Number - 32536204@A 64192MS3KQL1-1A June 2004...
  • Page 2 In no event will ADTRAN be liable for any special, incidental, or consequential damages or for commercial losses even if ADTRAN has been advised thereof as a result of issue of this publication.
  • Page 3: Revision History

    Fiber Node Cabinet System Manual Revision History Document Date Description of Changes Revision May 2004 This is the initial issue of this document. Future changes to this docume n - tation will be explained in this section. Conventions The following typographical conventions are used in this document: This font indicates a cross-reference link.
  • Page 4 ADTRAN offers product training. The training courses include overviews on product features and functions while covering applications of ADTRAN’s product lines. ADTRAN provides a variety of training options, including customized training and course taught at our facilities or at customer sites. For more information about training, please contact us.
  • Page 5: Table Of Contents

    ADTRAN Total Access 3000 ........
  • Page 6 Contents Fiber Node Cabinet System Manual 7. Total Access 3000 Customer Wiring ..........20 Total Access 3000 Shelf Wiring .
  • Page 7: Overview

    OVERVIEW This document supports the ADTRAN Total Access Fiber Node Cabinet (P/N 4192MS3KQL1). The Fiber Node Cabinet (FNC) is an individual system designed to provide cost-effective and remotely managed HDSL, HDSL2, HDSL4, and T1 transport from a fiber-fed backbone for the delivery of high capacity services.
  • Page 8: Physical Description

    Fiber Node Cabinet System Manual Table 1. Component Documentation (Continued) Component Document Number Total Access 3000/3010 Enhanced System Controller Unit Installation and 61181018L1-5 Maintenance Practice Total Access 23-Inch Heat Baffle and Fiber Tray Installation and Maintenance 61181003L1-5 Practice Total Access 23-inch Fan Filter Housing Assembly Installation and 61181971L1-5 Maintenance Practice Marconi MESA Sport NT on Riser...
  • Page 9: Equipment Chamber

    Fiber Node Cabinet System Manual Equipment Chamber The equipment chamber has two vertical equipment racks installed in a back-to-back configuration. The back-to-back equipment chamber houses the electronics and power systems and is divided into two bays. Bay 1 The front section of the equipment chamber (Figure 1) houses the electronic equipment including the ADC fiber splice shelf, two Total Access 3000 shelves, and two Total Access 23-inch Heat Baffle and Fiber...
  • Page 10: Bay 2

    Fiber Node Cabinet System Manual Bay 2 The back section of the equipment chamber (Figure 2) houses the Valere power supply/rectifier system, the Total Access 3000 shelf, Total Access 23-inch Heat Baffle and Fiber Tray with 23-inch Fan Assembly, a PECO II fuse and alarm panel, and an alarm wire-wrap panel.
  • Page 11: Ac Power/Splice Chamber

    Fiber Node Cabinet System Manual AC Power/Splice Chamber An additional door on the right side of the cabinet provides access to the AC power distribution and splice module chamber (end chamber). This chamber houses the AC load center, surge module protect blocks, and network side and field side splice modules.
  • Page 12: Battery Compartment

    Network Management Overview Management of the SONET (synchronous optical network) system itself for Operation, Administration, Maintenance, and Provisioning (OAM&P) is accomplished through the capabilities of the ADTRAN OC-3 and STS-1 multiplexer. Cabinet Specifications Refer to Marconi Document 640-205-001, Section 2.4, Cabinet Dimensions, for a detailed list of cabinet dimensions and specifications.
  • Page 13: Fnc System

    Fiber Node Cabinet System Manual FNC SYSTEM The ADTRAN FNC System uses the Total Access 3000 as the backbone for the local loop delivery platform. In addition to this, a number of additional components have been integrated to provide a turnkey solution.
  • Page 14: Figure 4. Total Access 3000 Fnc System

    Fiber Node Cabinet System Manual OC-3 Fiber Managment Shelf 1-25 26-50 27 X HDSL + 1 T1 Total Access 3000 51-75 56 Pairs Shelf A Loop 1: Pairs 1-28 76-100 Loop2: Pairs 101-128 101-125 126-150 200 Pair 200 Pair Cross Cross 151-175 28 X HDSL...
  • Page 15: Installation

    Fiber Node Cabinet System Manual INSTALLATION This section provides a sequential action process to install the FNC and verify it for online operation. Many references are made to the associated documents found on the CD included with this manual or the included hard copies behind identifying tabs in this document.
  • Page 16: Shipping Container

    To avoid injury or equipment damage, follow standard safety and handling practices and procedures when transporting and storing the ADTRAN cabinet to a staging or installation site. Refer to these safety procedures and the appropriate Marconi cabinet installation document. Shipping Container The cabinet should not be transported to the installation site until the concrete pad is cured and ready for cabinet installation, conduit laid, and the site prepared for installation.
  • Page 17: Wiring Connections

    Fiber Node Cabinet System Manual WIRING CONNECTIONS The ADTRAN FNC has its own AC power load center. The load center is supplied with commercial power. All AC equipment from the service drop to the pad is provided locally by the customer. This precludes the requirement for a separate power pedestal.
  • Page 18: Metallic Cable

    Fiber Node Cabinet System Manual 2. Remove the plastic nozzle from the bottom of each cable sleeve where a cable is to be installed. 3. Cut the small end of each plastic nozzle so that it can just fit over and be slipped onto an incoming cable (or cable bundle), small end first.
  • Page 19: Fiber Optic Cable

    Fiber Node Cabinet System Manual Fiber Optic Cable The customer is responsible for routing and terminating external fiber optic cable to the ADC fiber termi - nation shelf. Splicing of the fiber is done within the ADC shelf. Provide a minimum 50-foot coil of excess fiber cable in the cabinet from the external source before making the termination connection.
  • Page 20: Table 3. Total Access 3000 Equipment-Side Cross Connect Loop Wiring

    Fiber Node Cabinet System Manual Table 3. Total Access 3000 Equipment-Side Cross Connect Loop Wiring Total Access 3000 Slot to Loop Total Access 3000 Protect and Cross-Connect Panel Assignment Positions Slot Tip/Ring Shelf A Shelf B Shelf C T/R (Loop 1) T1/R1 (Loop 2) T/R (Loop 1) T1/R1 (Loop 2)
  • Page 21 Fiber Node Cabinet System Manual Table 3. Total Access 3000 Equipment-Side Cross Connect Loop Wiring (Continued) Total Access 3000 Slot to Loop Total Access 3000 Protect and Cross-Connect Panel Assignment Positions Slot Tip/Ring Shelf A Shelf B Shelf C T/R (Loop 1) T1/R1 (Loop 2) T/R (Loop 1) T1/R1 (Loop 2)
  • Page 22: Power Turnup

    Fiber Node Cabinet System Manual POWER TURNUP The FNC is equipped with an AC Load Center. The load center is located within the cabinet’s end chamber. Once power is available to the cabinet from a commercial power source, wire the main breaker following the instructions given in Marconi document 640-205-001, Section 4, AC Power.
  • Page 23: Turnup And Test Rectifier

    Fiber Node Cabinet System Manual Each ADTRAN FNC will accept a separately protected 240 VAC single phase, 60 Hz circuit. Load sizes (breakers) vary from 15 amps to 100 amps. For detailed installation and wiring instructions of the AC power to the AC load center, refer to Marconi document 640-205-001, Section 5, Cable Splicing, Termina- tion, and Configuration.
  • Page 24: Battery Installation And Test

    Fiber Node Cabinet System Manual Battery Installation and Test WARNING Electrical and Explosion Hazard. Batteries can be a lethal source of electrical power under certain conditions. Do not touch the connector posts. Do not lift cabinet with batteries installed. WARNING Prior to connecting the batteries to the rectifier, ensure that all AC and DC circuit breakers are in the OFF position.
  • Page 25: Turnup And Test Ecu

    Fiber Node Cabinet System Manual Turnup and Test ECU Each ADTRAN FNC System is equipped with a heat exchanger climate control system managed by an Environmental Control Unit. The ECU is an intelligent system used to sense, control, and report the inter- nal climate of the cabinet.
  • Page 26: Alarm Block Connections

    Total Access 3000 Shelf Wiring The loops for ADTRAN Total Access 3000 shelf wiring appears on the equipment side of the cross connect blocks. Beginning with the host shelf (A), HDSLx circuits are wired to the equipment side protection panel. Loop 1 pairs are wired sequentially to positions 1 through 84.
  • Page 27 The HDSLx module puts –190 VDC on the loops. Once the module is seated, provision the module to customer required service settings. Refer to the appro- priate ADTRAN access module Installation and Maintenance Practice or Job Aid for these settings. NOTE Craft personnel are responsible for installing the 5-pin protector modules when turning up the customer circuits.
  • Page 28: System Turnup Checklist

    Fiber Node Cabinet System Manual SYSTEM TURNUP CHECKLIST System Turnup Checklist includes verification of cable splicing, cable termination, system configuration, management functions, and site accommodations. Refer to the accompanying CD for specific documenta- tion not included in this binder. NOTE Each item is to be checked and verified.
  • Page 29: Protection Panels

    Fiber Node Cabinet System Manual Initial Date Protection Panels For information refer to the following: • Protection Panels on page 13. • MESA Sport NT on Riser: Section 5.3 under Marconi FNC (640-205-001) 7. Protection panels wired _____ _____ 8. Protectors properly grounded at MDF or relay racks _____ _____ 9.
  • Page 30: Environmental Control Unit (Ecu)

    • Total Access 3000 23-inch Chassis Installation and Maintenance Practice (P/N 61181001L1-5), Network Management Connections section 22. Turnup and test fiber MUX network management _____ _____ 23. Turnup and test ADTRAN Total Access 3000 network management _____ _____ Labeling 24. Door label schematic on inside front and rear doors...
  • Page 31: Warranty And Customer Service

    Fiber Node Cabinet System Manual WARRANTY AND CUSTOMER SERVICE ADTRAN will replace or repair this product within the warranty period if it does not meet its published specifications or fails while in service. Warranty information can be found at www.adtran.com/warranty.