Find Highest Point Of Travel; Check Power Head Location; Mounting Methods For Open Beam Or Finished Ceilings - Genie Quietlift 2040L Operation And Maintenance Manual

Ac powered belt drive
Hide thumbs Also See for Quietlift 2040L:
Table of Contents

Advertisement

NOTE
The header isa heavily reinforced section of the walljust
above the top ot the garage door opening.
A
Findverticalcenterlineof door and header:
Close door.
Measure door width at top.
Marka point at centerof door and on headerdirectly
abovedoor. Drawa centerline to connectpoints.
B
FindHeaderBracket m ounting height (Figure4): (Donot attach
HeaderBracket).
Raise door,watchingtop edgeof door and stop door
when itsedge reaches its highestpoint.
Measure distance("H")from top edgeof door to floor.
-
Forsectionaldoors, a dd 1"to"H'f Marka point
on centerline. Bottomof HeaderBracket w ill be
installedhere.
-
Forone-piecedoors,add 7"to"H'; Markthis pointon
centerline. Bottomof HeaderBracketwill be
installedhere.
H+ 1" - -
/
HEADER
SECTIONAL DOOR
Figure4
Find Highest Point of Travel
NOTE
• Forboth ty.pesof doors:
- If the ce_!mgin #9ur garageis so low that there
is not at leasta3" spaceabove the Header
Bracketmounting point, contact a Genie Factory
Authorized Dealer.
• If a door spring is in the way,place the Header
Bracketabovethe spring.Do Not move the door
spnng.
C
Checkwallfor a stud or a solidheaderat your mark:(If checkinga
finishedwall,a stud findermay be helpful).
If locationisaboveHeader, a 2"x 6" boardmust be
screwed to studsbesideyour markwith at leasttwo Lag
Screws and FlatWashers (not provided).
Transfer y our markto new mounting board.
Checkceilingor spaceabovewhereOpenerPowerHeadwill be
mounted (Figure5):
120 Volt grounded outlet
or wiring box within 3 feet of
Power Head.
Door Center Line
A
Figure 5 Check Power Head location
Measure from garagedoor centerline towardrearof garage:
Approximately 11'.
B
Findlocationof ceiling,joistor trussabovewhereOpenerPower
Headwill beand estimatetype and quantityof materialsneededfor
yourinstallation(Figure6).
MOUNTING
EXAMPLES
Perforated Angle Iron
Conduit
........................
J
Perforated Straps
FINISHED C EILINGS
Locate ceiling,joistsor trusses using
a stud finderor similardevice.
Attachangle iron(notincluded)to
`joistsor trusses throughfinish
materialusingLagScrews.
OPEN CEILINGS Straps and angle
iron mayattachdirectlyto joists
or trusses.
Figure 6 Mounting methodsfor open beamor finished ceilings
For Help, call 1-800-35-GENIE or visit www.geniecompany.com
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quietlift 2040c

Table of Contents