General Information
Lists unit test pressures.
Identifies installation, operation and maintenance and service data
literature.
Lists drawing numbers for unit wiring diagrams.
Pump Package Information - Optional
Compressor Nameplate
The compressor nameplate provides following information:
Compressor model number.
Compressor serial number.
Compressor electrical characteristics.
Utilization range.
Recommended refrigerant.

Unit Inspection

When the unit is delivered, verify that it is the correct unit and that it is
properly equipped. Compare the information which appears on the unit
nameplate with the ordering and submittal information.
Inspect all exterior components for visible damage. Report any apparent
damage or material shortage to the carrier and make a "unit damage"
notation on the carrier's delivery receipt. Specify the extent and type of
damage found and notify the appropriate Trane Sales Office.
Do not proceed with installation of a damaged unit without sales office
approval.
NOTE: If the Remote Evaporator Option is ordered, the remote evaporator
will be shipped in a separate crate.

Inspection Checklist

To protect against loss due to damage incurred in transit, complete the
following checklist upon receipt of the unit.
Inspect the individual pieces of the shipment before accepting the unit.
Check for obvious damage to the unit or packing material.
Inspect the unit for concealed damage as soon as possible after delivery
and before it is stored. Concealed damage must be reported within 15
days after receipt.
If concealed damage is discovered, stop unpacking the shipment. Do not
remove damaged material from the receiving location. Take photos of the
damage. The owner must provide reasonable evidence that the damage
did not occur after delivery.
Notify the carrier's terminal of the damage immediately, by phone and by
mail. Request an immediate, joint inspection of the damage with the car-
rier and the consignee.
Notify the Trane sales representative and arrange for repair. Do not repair
the unit, however, until damage is inspected by the transportation repre-
sentative.

Loose Parts Inventory

Check all the accessories and loose parts which are shipped with the unit
against shipping list. Included in these items will be water vessel drain plugs,
isolators, rigging and electrical diagrams, and service literature, which are
placed inside the control panel and/or starter panel for shipment.