Trane CLCH Installation Operation & Maintenance page 22

Quantumclimate changer air handling units
Table of Contents

Advertisement

6.16 Maintenance Plan for Air Handling Units
The following table (see Table 4) gives recommended maintenance intervals for the CLCH unit. Intervals are based upon normal
running conditions, in a moderate climate, and assuming 24-hour running.
Units operating outside these guidelines may require shorter or longer maintenance intervals.
Table 4 – Recommended Maintenance Intervals
Component
Fan / Motor
Filters
Coils
Humidifiers
Dampers
Attenuators
Inlet / Outlet
Energy Recovery Components
Controls
22
6. Maintenance
Check the Following
Fan In General
For Corrosion
Flexible Connection
Anti-Vibration Mounts
Inlet Guide Vane Controller
Drainage
Fan Bearing
Motors In General
Motor Bearing
Belt Drive In General
Panel Or Bag Filters
Roll Filters
Absolute Filters
Fin Block
Frost Protection
Drainage
Drop Eliminator
Steam Coils
Scaling
Condensate Drain
Dampers
Scilencers
Hoods And Louvers
Plate Heat Exchangers
Thermal Wheel
Control Box And Wiring
Weekly
Monthly
(see section)
(see section)
Yes (6.1)
Yes (6.1)
Yes (6.1)
Yes (6.1)
Yes (6.3)
Yes (6.5)
Yes (6.7)
Yes
Yes
Yes (6.8.4.)
Yes (6.10)
Yes (6.10)
Yes (6.13)
3-6 Monthly
Annually
(see section)
(see section)
Yes (6.1)
Yes
Yes (6.2)
Yes (6.3)
Yes
Yes (6.8.1.)
Yes (6.8.2.)
Yes (6.8.3.)
Yes (6.11)
Yes (6.12)
Yes (6.14)
Yes (6.15)
Yes
CLCH-SVX05A-GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents