Follett HCC1400W Operation And Service Manual page 22

Follett corp. hcc1400a, hcc1400w icemakers operation manual
Table of Contents

Advertisement

18. Using a wrench, rotate the shaft clockwise to align
the keyways in the gear housing
so as to accept the key.
19. Insert the key into the keyway.
20. Remove bolt and reinstall the washer and bolt.
Place retainer over bolt and secure with nut and
washer.
21. Lubricate body of stream divider with petrol-gel
and reinstall.
22. Plug gearmotor power cord into electrical box.
and the shaft
22
Fig. 24
Fig. 25
Fig. 26
Apply
petrol-gel

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcc1400a

Table of Contents