Unpacking And Inspecting The System - ADTRAN NetVanta 1000 Series Hardware Installation Manual

Hide thumbs Also See for NetVanta 1000 Series:
Table of Contents

Advertisement

NetVanta 1000/1000R Series Hardware Installation Guide

Unpacking and Inspecting the System

Each NetVanta 1000 and 1000R Series unit is shipped in its own cardboard shipping carton. Open each
carton carefully and avoid deep penetration into the carton with sharp objects. After unpacking the unit,
inspect it for possible shipping damage. If the equipment has been damaged in transit, immediately file a
claim with the carrier and contact ADTRAN Customer Service (refer to Repair and Return on page 8).
Contents of ADTRAN NetVanta 1000 and NetVanta 1000R Series Shipments
The NetVanta 1000 and 1000R Series units ship with the following items:
NetVanta 1000 and 1000R Series unit
A detachable power cable with a grounded, three-prong plug
ADTRAN OS System Documentation CD
Quick Start Guide
Warranty Card
61200500L1-34J
Copyright © 2006 ADTRAN, Inc.
Introduction
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents