Inspection and Installation
Chapter 2
TSU LT SHIPMENT
Inspecting for Damages
Carefully inspect the TSU LT for any shipping damage. If damage is suspected, file a claim immediately
with the carrier and then contact ADTRAN Customer Service. If possible, keep the original shipping
container for use in shipping the TSU LT back for repair or for verification of damage during shipment.
Shipping Contents
The following items are included in the ADTRAN shipment:
•
TSU LT unit
•
Power cable
•
RJ-48 T1 Cable
•
Documentation CD
•
Loopback plug
Customers must provide the DTE cable as well as a cable for the chain port, if it is used.
INSTALLING THE TSU LT
Power Connection
Each TSU LT unit comes with an eight-foot power cord, terminated by a three-prong plug which connects
to a grounded power receptacle.
Power to the TSU LT must be from a grounded 115 VAC, 60 Hz power source.
Grounding Instructions
Grounding instruction information from the Underwriters' Laboratory UL 1950 3rd Edition is provided in
this section. An equipment grounding conductor that is not smaller in size than the ungrounded
branch-circuit supply conductors is to be installed as part of the circuit that supplies the product or system.