Tools And Supplies Needed; Fire Safety; Inspect Appliance And Components; And Pre-Burn Checklist - Quadra-Fire VOYA-GRAND-MBK Owner's Manual

Voyageur grand wood insert automatic combustion control (acc)
Hide thumbs Also See for VOYA-GRAND-MBK:
Table of Contents

Advertisement

R
G. Tools And Supplies Needed
Before beginning the installation be sure the following tools
and building supplies are available:
7/16 Socket
Reciprocating saw
Pliers
Hammer
Phillips screwdriver
Flat blade screwdriver
Plumb line
Level
Wire Cutters to remove from pallet
1/2-3/4 in. length, #6 or #8 self-drilling screws
Misc. screws and nails
H. Fire Safety
To provide reasonable fire safety, the following should be
given serious consideration:
1.
Install at least one smoke detector on each floor of
your home to ensure your safety. They should be
located away from the heating appliance and close
to the sleeping areas. Follow the smoke detector
manufacturer's placement and installation instructions,
and be sure to maintain regularly.
2.
A conveniently located Class A fire extinguisher
to contend with small fires resulting from burning
embers.
I. Inspect Appliance and Components
Remove appliance and components from packaging and
inspect for damage.
Vent system components and doors are shipped in
separate packages.
Report to your dealer any parts damaged in shipment.
Read all the instructions before starting the
installation. Follow these instructions carefully
during the installation to ensure maximum safety and
benefit.
May 23, 2013
Framing materia
High temp caulking material l
Gloves
Framing square
Electric drill and bits
Safety glasses
Tape measure
VOYAGEUR GRAND Wood Insert
Pre-Burn Check List
1.
Place the appliance in a location near the final
installation area and follow the procedures below:
2.
Open the appliance and remove all the parts and
articles packed inside the Component Pack. Inspect
all the parts and glass for shipping damage. Contact
your dealer if any irregularities are noticed.
3.
All safety warnings have been read and followed.
4.
This Owner's Manual has been read.
5.
Floor protection requirements have been met.
6.
Venting is properly installed per vent manufacturing
instructions.
7.
The proper clearances from the appliance and chim-
ney to combustible materials have been met.
8.
The masonry chimney is inspected by a professional
and is clean, or the factory built metal chimney is
installed according to the manufacturer's instruc-
tions and clearances.
9.
The chimney meets the required minimum height.
10.
All labels have been removed from the glass
door.
11.
Plated surfaces have been wiped clean, if appli-
cable.
12.
A power outlet is available nearby for use of the
blower assembly.
Fire Risk.
Inspect appliance and components for damage.
Damaged parts may impair safe operation.
• Do NOT install damaged components.
• Do NOT install incomplete components.
• Do NOT install substitute components.
Report damaged parts to dealer.
7075-166C
WARNING
Page 29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents