Assembly And Installation - MTD 19A70020OEM Operator's Manual

Twin rear bagger
Hide thumbs Also See for 19A70020OEM:
Table of Contents

Advertisement

Assembly & installation
NOTE: References to left, right, front and rear of the tractor are
from the operator's
position,
unless otherwise
stated.
Before assembly,
place the tractor on a firm, level surface,
disengage
the PTO, stop the tractor engine
and set the
parking
brake.
For convenience,
pivot the seat forward
and leave it in
that position
until the grass collector
is fully mounted
and
assembled.
Assemble Mounting Brackets
To assemble the bagger mounting
assembly,
locate the
mounting
assembly
parts, as shown in Fig. 4-1, and follow these
steps:
1.
Attach the two hitch side brackets to the rear attachment
bracket
using four 710-3008
hex bolts and 712-04063
flange lock nuts from hardware
pack 689-00095.
See Fig.
4-1.
=_
,._
j
Figure 4=1
F
Figure 4-2
Assembling TheSupport Assembly
Locate the upright
support
bracket and the bag support
assembly. Assemble
it by following
these steps:
1.
Lay the bag support
assembly
topside
down with the
mounting
bracket portion
facing upwards.
2.
Insert the notched end of the upright support
bracket into the
bag support assembly, as in Fig. 4-2, and secure with a 5/16-18
carriage bolt and 5/16-18 flange lock nut packed in with the
upright
support
bracket, as seen in Fig. 4-3.
Figure 4-3

Advertisement

Table of Contents
loading

Table of Contents