Configuration
cable
a. From backplane 1, disconnect the following cables in the order listed:
v Power cable 1
v SAS signal cable 2
v Configuration cable 3
b. Lift backplane 1 out of the server by pulling it toward the rear of the server
and then lifting it up.
9. Install the new backplane in slot 2:
a. Connect the SAS signal cable to new backplane 2. The new backplane
comes with the option kit.
b. Connect the configuration cable to backplane 2.
c. Connect the cables which come with the option kit to backplane 1.
SAS
signal
cable
Chapter 2. Installing optional devices
Hard disk drive
backplane
Power
cable
69