EPSON AcuLaser C2000
4.2.7 High Voltage Board (HV1, HV2) Removal
4.2.7.1 HV1 (High Voltage Board) Removal
1. Remove the Rear Controller Cover. (See "Rear Controller Cover
Removal" on page -126.)
2. Remove the Rear Cover. (See "Rear Cover Removal" on page -127.)
3. Remove the Controller Box. (See "Controller Box Removal" on page
131.)
4. Remove 6 connectors, 2 screws, and 4 board supports from the HV1
Board.
5. Remove the insulation sheet under the HV1.
Figure 4-21. HV1 (High Voltage Board) Removal
The D terminal on the HV1 is not used.
Disassembly and Assembly
4.2.7.2 HV2 (High Voltage Board) Removal
1. Remove the Rear Controller Cover. (See "Rear Controller Cover
Removal" on page -126.)
2. Remove the Rear Cover. (See "Rear Cover Removal" on page -127.)
3. Disconnect the twenty 9 connectors from the MCU and discharge
harness for the HV2 and the transfer roller from the transfer roller.
4. Remove 2 screws securing the PWB-A support plate to the printer
frame.
5. Remove 2 screws securing the PWB-A and Controller Box. (See
"Controller Box Removal" on page 131.)
6. Remove the PWB-A support plate.
7. Remove 2 connectors, 3 board supports, and 1 screw from the PPWB-
A support plate, and remove the HV2 Board.
Figure 4-22. PWB-A Support Plate Removal
Disassembling Procedure
Revision C
133