HP StorageWorks 8/8 - SAN Switch Release Note page 31

Hp storageworks fabric os 6.2.0g release notes (5697-0355, march 2010)
Hide thumbs Also See for StorageWorks 8/8 - SAN Switch:
Table of Contents

Advertisement

GigE ports interface
GigE ports route
Non-local switch ports
display in zoning tree
Remove Offline or inac-
cessible Devices
Zone database summary
ping
Zoning
Encryption behavior
HP recommends that the encrypted LUN containers be created when all the nodes/Encryption
Engines (EE) in the Data Encryption Key (DEK)/High Availability Cluster (HAC) are up and enabled.
LUN configuration
The following process is to be used then when configuring a LUN for encryption:
Add the LUN as clear-text to the Crypto Target Container (CTC).
Once the LUN comes online and clear-text host I/O starts, modify the LUN from clear-text
to encrypt, including the enable_encexistingdata option to convert the LUN from
clear-text to encrypted.
An exception to this LUN configuration process: if the LUN was previously encrypted by the
HP Encryption Switch or HP Encryption Blade, the LUN can be added to the Crypto Target
Container with the –encrypt and –lunstate ="encrypted" options.
LUN configurations must be committed to take effect. No more than 25 LUNs can be added
or modified in a single commit operation. Attempts to commit configurations that exceed 25
LUNs will fail with a warning. Note that there is also a five-second delay before the commit
operation takes effect.
Always ensure that any previously committed LUN configurations or LUN modifications have
taken effect before committing additional LUN configurations or additions. All LUNs should be
in an Encryption Enabled state before committing additional LUN modifications.
Avoid changing the configuration of any LUN that belongs to a Crypto Target Container/LUN
configuration while the re-keying process for that LUN is active. If the user changes the LUN's
settings during manual or auto, re-keying or First Time Encryption, the system reports a warning
message stating that the encryption engine is busy and a forced commit is required for the changes
to take effect. A forced commit command halts all active re-keying processes running in all Crypto
Port Admin Module >
GigE tab
Port Admin Module >
GigE tab
Zone Admin
Admin Domain
Switch Admin > DCC
policies
Performance Monitoring
Zone Admin
Zone Admin
HP StorageWorks Fabric OS 6.2.0g release notes
Configure > FCIP tunnel
Configure > FCIP tunnel
Configure > Zoning
Configure > Zoning
Replace/Replace All zone
members by selecting the offline
devices from the zone tree.
Offline devices have an unknown
overlay badge with good
visibility.
Configure > Zoning
Zoning report for both online and
offline database
In Web Tools,
non-local switch
port id/WWN
can be added us-
ing text box.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents