Site Preparation Checklist

Table D-1
Task No. Planning Activity
1
2
3
4
5
6
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
Cisco MDS 9200 Series Hardware Installation Guide
D-2
Site Planning Checklist
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Air flow
Power evaluation:
Input power type
1
Power receptacles
Receptacle proximity to the
equipment
Dedicated circuit for power supply
Dedicated (separate) circuits for
redundant power supplies
2
UPS
for power failures
Grounding evaluation:
Circuit breaker size
CO ground (AC- powered systems)
Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
3
EMI
evaluation:
Distance limitations for signaling
Site wiring
4
RFI
levels
Appendix D
Site Planning and Maintenance Records
Verified By
Time
Date
OL-16188-01