Instruction manual SGE
Preparation
Undo the screws of the cap over the terminal block of the collector. This has the
following terminals:
Pump ON/OFF
Modulating pump
-
L
N
1
6
7
8
9
10
1
2
3
4
J12
Connecting the mains power
Note
Just as with the appliance controller, the solar heating system controller
must have a permanent electrical connection to the mains power supply. There
must be a double-pole isolator installed in the permanent connection. This is the
same double-pole isolator as installed between the mains power supply and the
appliance itself. Whenever this isolator is operated, both controllers can be
switched on or off.
1. Connect earth, live and neutral to terminals 1 through 3
2. Fit the cables in the strain relief.
3. Connect the power cable to the isolator.
4. Continue
(3.12.3 "Connecting pump station - modulating
Connecting pump station - modulating pump
The pump station contains a modulating pump (4-wire connection). You must
connect this pump to the controller of the solar heating system.
1. Connect earth, live and neutral to terminals 10 through 12.
2. Connect the fourth lead to terminal 13
3. Fit the cables in the strain relief.
4. Continue
(3.12.4 "Connecting solar
Connecting solar collector
Note
This sensor must be mounted in the solar collector; refer to the solar
collector installation manual.
Connect the sensor to the appliance as follows:
1. Connect the sensor to terminal 2 and 4 of J13.
2. Fit the cables in the strain relief.
3. Continue
(3.12.5 "Connecting tank
L
N
M
-
-
2
11
12
13
14
15
1
2
3
4
J13
collector").
sensor").
n.a.
-
-
-
-
-
16
17
18
19
20
1
2
3
4
J14
pump").