A.c.g. Set Installation; Right Crankcase Cover Installation - Eton VECTOR ST 250 Service Manual

Hide thumbs Also See for VECTOR ST 250:
Table of Contents

Advertisement

Install reduction gear shaft and reduction gear.

10-9 A.C.G. Set Installation

Install the A.C.G. coil set onto right crankcase
cover (3 screws).
Install pulse generator (2 screws).
Tie the wire harness securely onto the indent of
crankcase.
Caution
Make sure that the wire harness is placed under
pulse generator.
10-10 Right Crankcase Cover
Installation
Install dowel pin and new gasket.
Remove water pump cover.
Install right crankcase cover onto the crankcase.
Note: Align the water pump shaft indent with the oil
pump shaft.
Wire
Dowel pin
91
Reduction gear
2 bolts
3 screws

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

250

Table of Contents