Chapter 4
Installing Hardware Components
This chapter is divided into two major parts as follows:
Accessing Non Hot-Plug Areas - you must shut down the server power
and remove the power cord(s) from the power supplies in order to install
options, upgrades or replacements in the following areas:
Accessing Hot-Plug Areas - you can install hot-plug options, including
hot-plug power supplies and SCSI hard drives, and upgrades or
replacements without shutting down the power in the SCSI drive bay
area.
NOTE: The illustrations in this chapter may vary slightly depending on
whether you have a tower model or rack model.
Intel Pentium II Xeon Processors
Memory board and sockets
System board
Peripheral board
Drive cage backplane board
One shared PCI/ISA slot
Six PCI slots
Fans
Power supply lock
Integrated Management Display (tower model only)
Duplex drive cage
For use with Intel Pentium II Xeon processor-based servers only
Compaq ProLiant 5500 Servers Setup and Installation Guide
4-1