Pre-Installation Planning; Power Requirements - Compaq ProLiant 5500 Setup And Installation Manual

Pentium ii xeon processor-based servers
Hide thumbs Also See for ProLiant 5500:
Table of Contents

Advertisement

Pre-installation Planning

This section discusses the power, grounding, and temperature requirements of
the Compaq ProLiant 5500 server.

Power Requirements

The power load needs to be balanced between available AC supply
branch circuits.
The overall system AC current load must not exceed 80 percent of the
branch circuit AC current rating.
If power strips are used, the load should not exceed 80 percent of the
power strip's marked electrical current rating.
The installation of this equipment shall be in accordance with Local/Regional
electrical regulations governing the installation of Information Technology
Equipment by licensed electricians. This equipment is designed to operate in
installations covered by the National Electric Code (ANSI/NFPA 70, 1993) and
the code for Protection of Electronic Computer/Data Processing Equipment
(NFPA-75, 1992).
WARNING: To reduce the risk of personal injury, fire, or
damage to the equipment, do not overload the AC supply branch
circuit that provides power to the server. Consult the electrical
authority having jurisdiction over your facility wiring and
installation requirements.
For use with Intel Pentium II Xeon processor-based servers only
Compaq ProLiant 5500 Servers Setup and Installation Guide
2-3