Installing Hardware Options - Compaq ProLiant 3000 Setup And Installation Manual

Hide thumbs Also See for ProLiant 3000:
Table of Contents

Advertisement

Chapter 4

Installing Hardware Options

This chapter is divided into three major parts:
Preparing the Server - This section describes how to properly shut
down your server in order to install hardware options.
Accessing Non Hot-Plug Areas - you must shut down the server power
in order to install options, upgrades, or replacements in the following
areas:
Processor and sockets
Memory and sockets
System Board
Drive Cage Backplane Board
Media Bays
PCI/ISA slots
Fans
Integrated Management Display
Accessing Hot-Plug Areas - you can install hot-plug options, upgrades,
or replacements without shutting down the power in the following areas:
SCSI drive bays
Power supplies
NOTE: The illustrations in this chapter may vary slightly depending on
whether you have a tower model or rack model.
For use with 350-MHz or greater Intel processor-based servers only
Writer: Cheri Stewart Project: Compaq ProLiant 3000 Servers Setup and Installation Guide Comments: 179776-002
File Name: E-CH04.DOC Last Saved On: 1/12/99 1:28 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
Compaq ProLiant 3000 Servers Setup and Installation Guide
4-1

Advertisement

Table of Contents
loading

Table of Contents