NETGEAR GSM7328Sv1 - ProSafe 24+4 Gigabit Ethernet L3 Managed Stackable Switch Hardware Installation Manual page 13

Managed stackable layer 3 switches
Hide thumbs Also See for GSM7328Sv1 - ProSafe 24+4 Gigabit Ethernet L3 Managed Stackable Switch:
Table of Contents

Advertisement

Managed Stackable Layer 3 Switches GSM7328S v2 and GSM7352S v2 Hardware Installation
Table 2-1. LED Descriptions for GSM7328S v2 (continued)
LED
Description
10/100/1000M
Link/ACT LED
Ports
• Off: No link is established on the port.
(2 LEDs per port)
• Solid green: A valid link is established on the port.
• Blinking green: The port is sending or receiving packets.
SPD LED
• Off: No link is established on the port.
• Solid yellow: A valid 10/100 Mbps link is established on the port.
• Solid green: A valid 1000 Mbps link is established on the port.
Note: If port 21–24 media is changed to SFP, the RJ-45 LEDs
change to OFF status.
SFP Ports
• Off: No SFP module link is established on the port.
(1Link/ACT LED
• Solid green: A valid 1000Mbps SFP module link is established on
per port)
the port.
• Blinking green: Packet transmission or reception is occurring on
the port at 1000Mbps.
• Solid yellow: A valid 100Mbps SFP module link is established on
the port.
• Blinking yellow: Packet transmission or reception is occurring on
the port at 100Mbps.
Note. If port 21–24 media is changed to copper, the SFP LEDs
change to OFF status.
SFP+ Ports
SPD/Link/ACT LED:
(1 Link/ACT LED
• OFF: No SFP module link is established on the port.
per port)
• Solid green: A valid 10Gbps SFP+ module link is established on
the port.
• Blinking green:Packet transmission or reception is occurring on
the port at 10Gbps.
Introduction
v1.0, July 2009
2-3

Advertisement

Table of Contents
loading

Table of Contents