Snapshotting The Zenworks Orchestrator Environment; Enabling Rollback And Backing Up The Server Instance - Novell PLATESPIN ORCHESTRATE 2.0.2 - UPGARDE GUIDE 10-09-2009 Upgrade Manual

Hide thumbs Also See for PLATESPIN ORCHESTRATE 2.0.2 - UPGARDE GUIDE 10-09-2009:
Table of Contents

Advertisement

Monitoring Server
VM Warehouse
Orchestrator Agent
Orchestrator Clients
Linux High Availability Clients
Upgrade to PlateSpin Orchestrate by following these sections and their subordinate steps in this
order:
1.
Section 2.8.1, "Snapshotting the ZENworks Orchestrator Environment," on page 49
2.
Section 2.8.2, "Enabling Rollback and Backing Up the Server Instance," on page 49
3.
Section 2.8.3, "Upgrading the ZENworks Orchestrator Server," on page 50
4.
Section 2.8.4, "Removing Obsolete ZENworks Orchestrator Patterns," on page 51
5.
Section 2.8.5, "Configuring Upgraded Orchestrate Servers in the High Availability
Environment," on page 51
6.
Section 2.8.6, "Installing and Configuring Monitoring in the High Availability Environment,"
on page 52

2.8.1 Snapshotting the ZENworks Orchestrator Environment

To prepare the environment for an upgrade to a PlateSpin Orchestrate environment, snapshot the old
environment.
1 From the machine where the VM Warehouse is installed (c122), stop all VMs, then move them
out of the warehouse to another repository on a VM host in the grid.
2 Use the high availability client (Heartbeat2) to stop the Orchestrate Server. This prevents the
high availability cluster from re-starting the Orchestrate Server.
3 Use the following command to restart the Orchestrate Server on the host where it was last
running.
/etc/init.d/novell-zosserver start
4 Use the following command to stop and snapshot the Orchestrate Server.
/etc/init.d/novell-zosserver stop --snapshot

2.8.2 Enabling Rollback and Backing Up the Server Instance

When the old environment is snapshotted, you need to further prepare the Orchestrate Server for the
upgrade.
1 From the command line of both Orchestrate Servers (c114 and c115), use the rug command to
enable the rollback for the server.
rug set rollback true
2 From the command line of both Orchestrate Servers (c114 and c115) use the following
command to back up your server instance before you upgrade.
cp -rH /var/opt/novell/zenworks/zos/server ~/server.bkp
You can use the
rpm -qa | grep zenwo | sort
in the cluster:
Upgrading ZENworks Orchestrator 1.3 Components to PlateSpin Orchestrate 2.0
command to list the rpms that are currently
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Platespin orchestrate 2.0.2

Table of Contents