Omron WIRED REMOTE I-O System Manual page 54

Rack pcs
Table of Contents

Advertisement

Delayed Activation of Slaves
Example 4: JMP/JME
Programming (C200H PCs)
The initialization and main programs in the following ladder diagram will not
be executed until the remote I/O error and I/O verification error have been
cleared (i.e., until all Slaves have been turned on). Errors are cleared with
FAL(06) 00. The type of programming in this example is only effective after
an I/O table has been created.
04900
TIM 000
(Normally ON)
04902
25315
(Normally ON)
25312
25310
(I/O verification error)
04900
25313
(Normally ON)
04900
12800
25313
JMP(04) 01
DIFU(13) 04902
JMP(04) 02
JMP(04) 03
JME(05) 01
Initialization program
Main program
04900
JME(05) 03
FAL(06) 00
JME(05) 03
12801
TIM 000
04900
END(01)
Section 3-4
#0100
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sysmac c-series

Table of Contents