Download Print this page
Omron FLOW EM2100 Service Manual

Omron FLOW EM2100 Service Manual

Fleet operation workspace

Advertisement

Quick Links

Fleet Operation Workspace (FLOW)
EM2100 & AMR
Service Guide
18982-008 Rev C
Fleet Operation Workspace (FLOW) Service Guide

Advertisement

loading

Summary of Contents for Omron FLOW EM2100

  • Page 1 Fleet Operation Workspace (FLOW) EM2100 & AMR Service Guide 18982-008 Rev C Fleet Operation Workspace (FLOW) Service Guide...
  • Page 2 This page intentionally left blank P/N 18982-008 Rev A FLOW Service Guide...
  • Page 3: Introduction

    The worker should be familiar with working on electronic equipment and use proper electrostatic discharge (ESD) procedures. Make sure to read and understand this Service Guide before starting any work. Omron recommends reading and understanding the following manuals in addition to this Service Guide: o EM2100 Installation Guide o Fleet Operations Workspace Core User’s Guide (Document Number: 20569-020)
  • Page 4: Table Of Contents

    Table of Contents ..............................1 INTRODUCTION TABLE OF CONTENTS ............................2 REVISION HISTORY ............................3 01. REPLACING DONGLES IN THE EM2100 ....................4 02. REPLACING DONGLES IN AMRS ....................... 7 03. REPLACING A FAILED EM2100 ........................9 04. REPLACING A FAILED EM1100 ......................... 11 P/N 18982-008 Rev A FLOW Service Guide...
  • Page 5: Revision History

    Revision History Modified Date Contents / Reason Created by Original release June 7, 2019 Sam Muse FLOW Service Guide P/N 18982-008 Rev A...
  • Page 6: Replacing Dongles In The Em2100

    01. Replacing Dongles in the EM2100 Use the following procedure to remove and replace either the EM2100 FLOW License Dongle or the EM2100 Legacy License Dongle in the EM2100. The EM2100 FLOW License Dongle uses a battery that has a lifespan of approximately 5 years.
  • Page 7 5. Replacing Dongles in an EM2100 Step Check Item Task to be Performed Check Identify In SetNetGo (SNG) go to the license tab. Record the EM2100 FLOW License ID Number. Dongle ID Include this number when sending C2V to license administrator. Note: This step is only necessary when replacing the EM2100 FLOW License Dongle □...
  • Page 8 Step Check Item Task to be Performed Check Replace Remove old EM2100 FLOW License Dongle and insert new dongle. EM2100 FLOW License Dongle □ FLOW Dongle Replace Remove old EM2100 Legacy License Dongle and insert new dongle. EM2100 Legacy Dongle Legacy License Dongle...
  • Page 9: Replacing Dongles In Amrs

    02. Replacing Dongles in AMRs Use the following procedure to replace the AMR Legacy License Dongle or the AMR FLOW License Dongle in an AMR. Installation is the reversal of removal. 1. Locations LD Robot Core Parts and tools needed to replace dongles in the AMR are: 2.
  • Page 10 5. Replacing Dongles in AMRs Step Check Item Task to be Performed Check Download Follow the procedure in the LD service manual (18745-000) section 1-1 (Download the file) Debug info and and section 1-2 (Download the Debug info file). This will backup the system in case of check for AMR core failure.
  • Page 11: Replacing A Failed Em2100

    03. Replacing a Failed EM2100 Use the following procedure to replace a failed EM2100. 1. Locations Parts and tools needed to replace EM2100 are: 2. Replacement Parts Part Name Type Quantity Image Enterprise Manager 2100, 100 Robot Licenses, 11168-200F 3. Consumables Name Note 4.
  • Page 12 5. Replacing a failed EM2100 Step Check Item Task to be Performed Check Remove dongles Following the procedure: Replacing Dongles in an EM2100 (pg. 3), remove the from the failed EM2100 FLOW License Dongle and the EM2100 Legacy License Dongle from the □...
  • Page 13: Replacing A Failed Em1100

    04. Replacing a Failed EM1100 Use the following procedure to replace a failed EM1100. Note: The replacement for an EM1100 is an EM2100. 1. Locations Parts and tools needed to replace EM1100 are: 2. Replacement Parts Part Name Type Quantity Image Bundle, Primary Fleet Manager, FLOW Core 20271-900...
  • Page 14 5. Replacing a failed EM1100 Step Check Item Task to be Performed Check Remove EM1100 If installed in a rack, remove the EM1100 from the rack. To do this pull the EM1100 until it is from rack fully extended from the track. Press the locking bottons on the side of the rail and continue to pull until EM comes out of the rack.
  • Page 15 OMRON AUTOMATION AMERICAS HEADQUARTERS • Chicago, IL USA • 847.843.7900 • 800.556.6766 • automation.omron.com OMRON CANADA, INC. • HEAD OFFICE OMRON ELETRÔNICA DO BRASIL LTDA • HEAD OFFICE Toronto, ON, Canada • 416.286.6465 • 866.986.6766 • automation.omron.com São Paulo, SP, Brasil • 55.11.2101.6300 • www.omron.com.br OMRON ELECTRONICS DE MEXICO •...

This manual is also suitable for:

Flow amr