S Load Gear, T Load Gear, S Load Lever Assembly - Sony SLV-E105 Service Manual

Table of Contents

Advertisement

3-17.
S LOAD GEAR, T LOAD GEAR,
(T side)
1)
2)
3)
4)
S LOAD LEVER ASSEMBLY AND
T LOAD LEVER ASSEMBLY
(See Figs.3-17-1, 3-17-2 and 3-17-3)
Refer to section 3-16 and remove the crescent slide.
Refer to section 3-14-2 and remove the S and T incline
mounting assemblies.
Remove
the clamp @), then remove the components:
the S load gear @, the S load spring@ and the S load
lever assembly @. When you do this, be careful not to
damage the clamp @), which can be damaged easily.
"Again,
be
careful
when
you
disassemble
the
components, as the S load spring@® will spring out.
(S side)
Remove
the
following
components:
the
T load
gear G), the T load spring ©, and the T load lever
assembly @). Be careful when
you disassemble
the
components, as the T load spring © will spring out.
ASSEMBLY NOTES:
1.
Parts A
(apply
Apply grease SGL-505 to the shafts
@ , @ and parts
A shown in Fig.3-17-1. Then apply grease, SGL-505
to the parts shown in Fig.3-17-2.
When fitting the S load gear @) and the T load gear ©)
align them in the tape-loaded state, as shown in Fig. A
in Fig.3-17-3. Again, after completing tape-unloading
on
these
gears,
check
that they are
positioned
as
shown in Fig. B in Fig.3-17-3, then refer to section 3-14-
2 and fit the S and T incline mounting assemblies.
@T load lever
assembly ~~
®©T load
spring
Sex)
©}
OF
aN
Ty
@)S load lever
assembly
@Clamp
®T toad
gear
Fig.3-17-1
5-24
Apply
grease here
grease
inside
the ho
le
Apply grease to the gears
grea
here
Apply
grease here
Apply grease inside
se
the hole
Apply
grease here
Fig.3-17-2
Fig. A: When tape loading is complete
T load gear
S load gear
Fig. B: When tape unloading is complete
T load gear
|
S load gear
Fig.3-17-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slv-e110itRmt-v166b

Table of Contents