Start Up

1. Go through the Pre-Operation Checklist in Table 8.
Table 8: Pre-Operation Checklist
Checklist
System grounded
Verify all grounding connections were made. See
the Installation manual.
All connections tight and correct
Verify all electrical, fluid, air, and system connec-
tions are tight and installed according to the
Installation manual.
Fluid supply containers filled
Check component A and B and solvent supply
containers.
Mix manifold valves set
Check that mix manifold valves are set correctly.
Start with the settings recommended in Mix Mani-
fold Valve Settings, page 47, then adjust as
needed.
Fluid supply valves open and pressure set
Component A and B fluid supply pressures should
be equal unless one component is more viscous
and requires a higher pressure setting.
Solenoid pressure set
75-100 psi inlet air supply (0.5-0.7 MPa, 5.2-7 bar)
2. Turn the AC Power Switch ON (I = ON, 0 = OFF).
F
. 61. Power Switch
IG
312776B
➜ Graco logo, software revision, and "Establishing
➜ At power up the system defaults to Recipe 61,
➜ In bottom left corner, the system status displays,
F
. 62. Status Screen
IG
3. Make sure that the Booth Control is working. The
active recipe number should display and the
Standby LED
4. If this is the first time starting up the system, purge it
as instructed in Purging Fluid Supply System,
page 56. The equipment was tested with lightweight
oil, which should be flushed out to avoid contaminat-
ing your material.
I = ON
5. Make sure that the Booth Control is in Standby
TI12656a
Communication" will display, followed by Status
screen. See page 19.
which is not a valid recipe number. Initiate a
color change to Recipe 0 or a valid recipe num-
ber (1-60).
which can be Standby, Mix, Purge, or an alarm
notification
should be lit.
mode.