Start Up - Graco ProMix 2KS Operation

Plural component proportioner
Hide thumbs Also See for ProMix 2KS:
Table of Contents

Advertisement

Start Up

1. Go through the Pre-Operation Checklist in Table 14.
Table 14: Pre-Operation Checklist
Checklist
System grounded
Verify all grounding connections were made. See
the Installation manual.
All connections tight and correct
Verify all electrical, fluid, air, and system connec-
tions are tight and installed according to the
Installation manual.
Check air purge valve tubing
Check the air purge valve supply tube daily for
any visible solvent accumulation. Notify your
supervisor if solvent is present.
Fluid supply containers filled
Check component A and B and solvent supply
containers.
Mix manifold valves set
Check that mix manifold valves are set correctly.
Start with the settings recommended in Mix Mani-
fold Valve Settings, page 88, then adjust as
needed.
Fluid supply valves open and pressure set
Component A and B fluid supply pressures should
be equal unless one component is more viscous
and requires a higher pressure setting.
Solenoid pressure set
75-100 psi inlet air supply (0.5-0.7 MPa, 5.2-7 bar)
2. Turn the AC Power Switch ON (I = ON, 0 = OFF).
F
. 100. Power Switch
IG
312779E
F
IG
3. Verify that the EasyKey is working. The active rec-
4. If this is the first time starting up the system, purge it
5. Make sure that the EasyKey is in Standby (remove
6. Adjust component A and B fluid supplies
7. Do not exceed the maximum rated work-
I = ON
8. Open the fluid supply valves to the
9. Adjust the air pressure. Most appli-
TI12656a
Get other manuals https://www.bkmanuals.com
➜ Graco logo, software revision, and "Establishing
Communication" will display, followed by Status
screen. See page 22.
➜ At power up the system defaults to Recipe 61,
which is not a valid recipe number. Initiate a
color change to Recipe 0 or a valid recipe num-
ber (1-60).
➜ In bottom left corner, the system status dis-
plays, which can be Standby, Mix, Purge, or an
alarm notification.
. 101. Status Screen
ipe number and Standby mode should be displayed.
as instructed in Purging Fluid Supply System,
page 96. The equipment was tested with lightweight
oil, which should be flushed out to avoid contaminat-
ing your material.
Mix input).
as needed for your application. Use low-
est pressure possible.
ing pressure shown on the system identification
label or the lowest rated component in the system.
system.
cations require about 80 psi (552
kPa, 5.5 bar) air pressure to operate properly. Do
not use less than 75 psi (517 kPa, 5.2 bar).
System Operation
89

Advertisement

Table of Contents
loading

Table of Contents