OPERATION
PRISM
CENTRAL SYSTEM 2
®
STARTUP
The following points are to be checked and implemented before
Electricity - Check for connection to a proper three phase line
voltage connection for optimal performance. The fan motor will
be rated for the applied line voltage to the unit. Ensure supply
lines to the unit are properly fused and all local electrical codes
are followed.
Pneumatics - Check that the compressed air is connected.
Compressed air should be clean, dry and oil free and at a
pressure between 5 - 6 Bar (72 - 87 psi). Do not set pressure
above 6 Bar (87 psi) at the unit's regulator.
For best unit performance, set the regulator pressure at
NOTE:
6 Bar (87 psi).
SET POINTS
Default values enable basic unit operation. Each value should be
given consideration for optimized operation, and can be adjusted
with continued use and experience using the equipment. Consult
Lincoln Electric Field Service to shorten the learning curve.