Navien NHB H Series Installation And Operation Manual page 48

Table of Contents

Advertisement

Tighten the boiler connection valves
Note
with care to avoid damage.
The gas connection fitting on all
boilers is
/
3
4
/
in rigid pipe can be used; refer to
1
2
the sizing tables on the proceeding
pages for limitations. Do not use
corrugated connectors or tubing as
noise may occur.
Corrugated Connector
When using flexible gas lines, ensure
that the pipe's inner diameter and
connector is sufficient to supply the
required BTUs. Also, ensure that the
flexible line has no crimps or tight
bends in it, as this will restrict gas flow.
When using rigid pipe, Navien
recommends the installation of a
union on the gas supply line close
to the boiler, to facilitate any future
maintenance or service.
NOTICE
Prior to using an excess flow valve (EFV) in the
gas line, check the manufacturer's minimum and
maximum flow capacity rating. An improperly
sized EFV will not allow for a full flow of gas to
the boiler and may cause improper operation.
CLOSE:
195
MAX OPER:
135
BYPASS:
5
Excess Flow Valve
48
Connecting the Gas Supply
in.
/
in
1
2
CLOSE:
195
MAX OPER: 135
BYPASS:
5
Typical LP Gas piping examples:
2 Stage System with Multiple
Regulators (Recommended)
Gas Regulator (2 Stage)
High
Pressure
Regulator
Gas Tank
Single Regulator System
Gas Regulator
(12" WC)
Pipe
Gas Tank
Low Pressure Regulator
(to home or building)
Full size
Gas Pipe
Full size
Gas Pipe
Full size
Gas Pipe

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nhb-055hNhb-080hNhb-110hNhb-150hNhb-h series

Table of Contents