Page 1
VL2GSS & VL3GSS GA S FOOD STEAMERS MODEL VL2GSS ML-52389 VL3GSS ML-52393 For additional information on Vulcan-Hart or to locate an authorized parts and service provider in your area, visit our website at www.vulcanhart.com VULCAN-HART DIVISION OF ITW FOOD EQUIPMENT GROUP, LLC WWW.VULCANHART.COM INSTALLATION &...
VL2 & VL3 GAS FOOD STEAMERS SAVE THESE INSTRUCTIONS FOR FUTURE USE Vulcan-Hart suggests that you thoroughly read this entire manual and carefully follow all of the instructions provided. Your Vulcan Model VL Food Steamer is produced with quality workmanship and materials.
INSTALLATION CODES AND STANDARDS In the United States, the Vulcan steamer must be installed in accordance with state and local codes, with the National Fuel Gas Code, (ANSI-Z223.1, latest edition) available from the American Gas Association, 1515 Wilson Boulevard, Arlington, VA 22209, with the National Electrical Code (ANSI/ NFPA No.
PLUMBING CONNECTIONS WARNING: PLUMBING CONNECTIONS MUST COMPLY WITH APPLICABLE SANITARY, SAFETY AND PLUMBING CODES. Water Requirements Proper water quality can improve the taste of the food prepared in the steamer, reduce liming in the steam generator and extend equipment life. Local water contitions vary from one location to another.
GAS CONNECTION CAUTION: All gas supply connections and any pipe joint compound used must be resistant to the action of liquefied petroleum gases. Codes require that a gas shutoff valve be installed in the gas line ahead of the steamer. Connect the gas supply line to the gas valve on the steamer.
INSTALLATION DRAWING Models VL2GSS & VL3GSS LEGEND GAS CONNECTION: " NPT BOILER FEED CONNECTION FOR FILTERED WATER: WATER CONNECTION FOR BOILER DRAIN CONDENSER: ELECTRICAL CONNECTION: 120 V, 60 HZ, 1 PH, 300 WATTS MAX DRAIN: 3 " DIA. PROVIDE FLOOR SINK FOR OPEN GAP TYPE DRAIN.
WARNING: THE STEAMER AND ITS PARTS ARE HOT. CLEANING AND SERVICING THE STEAMER. STEAMERS WITH ELECTRONIC IGNITION 1. Make sure all supply connections for electric, gas and water are on. 2. Turn the knob on the Gas Combination Valve (Fig. 7) counterclockwise to the ON position. 3.
Page 11
OPTIONAL MANUAL BLOW DOWN VALVE AUTOMATIC BLOW DOWN VALVE GAS COMBINATION VALVE Fig. 7 – 11 –...
STEAM COOKING — COMPARTMENT OPERATION Refer to the Steam Cooking with Vulcan Kettles and Steamers (booklet packed with your steamer) for suggested cooking times of various foods. All cooking times are approximate because size, weight, pan loading and product quality will affect steamer cooking times. Use these suggestions and then adjust cooking times to your own requirements.
SELECTION OF PANS FOR STEAM COOKING VL steamer compartments are designed to accept combinations of the following perforated or solid cooking pans (Fig. 8): PAN ACCOMODATION, PER COMPARTMENT Max Qty Pan Size 12 X 20 12 X 20 12 X 20 18 X 26 (center support removed) 12 x 20...
Perforated Frozen Vegetables. Loosen vegetable. Solid Precooked Dishes. Remove wrapping and place in pan. Separate frozen food packs into smaller chunks. If unpacked pre-cooked frozen dishes require more than 15 minutes to cook, cover the pan. When a cover is used, about one-third more cooking time is required. This is true only of foods in either portion size or in larger sizes which cannot be cooked in the covered containers in which they are packed.
If a leak occurs in one corner only and the gasket appears serviceable, turn the stainless steel screw on the gasket plate adjacent to the leaking corner one-half turn counterclockwise. Do not attempt excessive turning of screws since misalignment of the door is possible. If the door is misaligned, call your local Vulcan-authorized servicer. – 15 –...
To obtain service and parts information concerning this steamer, contact the Vulcan-Hart Service Agency in your area (refer to listing supplied with the steamer), or contact the Vulcan-Hart Service Department at the address or phone number shown on the front cover of this manual. Parts and service manuals are also available at WWW.VULCANHART.COM...