Figure 31
Bottom View
1. Angled plug
2. 3-way manifold coil
13.
Route the remaining loose harness ends down
around the lower frame and connect them to 2
coils on the flow-divider manifold just inside of
the right, front tire
Figure 32
Bottom View
1. Right of machine
3. 3-way manifold
(Figure 28
and
Figure
32).
2. Front of machine
8
Completing the Installation
No Parts Required
Completing the Installation (4WD
Switch Only)
1.
Connect the positive battery cable to the positive
post of the battery; refer to the Operator's
Manual for your machine.
g205040
WARNING
Incorrect battery-cable routing could
damage the machine and cables causing
sparks. Sparks can cause the battery
gasses to explode, resulting in personal
injury.
• Always disconnect the negative
(black) battery cable before
disconnecting the positive (red)
cable.
• Always connect the positive (red)
battery cable before connecting the
negative (black) cable.
2.
Connect the negative battery cable to the
negative post of the battery; refer to the
Operator's Manual for your machine.
3.
Close the right toolbox cover and install the right
console cover
g205041
17
(Figure
1).