How To Raise The Guardrails - Terex Genie GS-1932 XH Operator's Manual

Hide thumbs Also See for Genie GS-1932 XH:
Table of Contents

Advertisement

Operator's Manual
Operating Instructions
GS-2046, GS-2646, GS-3246
The platform railing system consists of three fold
down rail sections for the extension deck and three
sections for the main deck. All six sections are held
in place by four wire lock pins.
1
Fully lower the platform and retract the platform
extension.
2
Remove the platform controls.
3
From inside the platform, remove the two front
wire lock pins.
4
Fold down the front rail assembly. Keep hands
clear of pinch points.
5
Replace the two removed pins back into each
side rail bracket.
6
Fold down each side rail assembly. Keep
hands clear of pinch points.
7
At the rear of the main deck, remove the two
wire lock pins.
8
Carefully open the gate and move to the
ground.
9
Fold down the rear gate and entry side rails as
one unit. Keep hands clear of pinch points.
10 Fold down the left and right side rails. Keep
hands clear of pinch points.
11 Replace the two removed pins back into each
side rail bracket.
78

How to Raise the Guardrails

Follow the fold down instructions but in reverse
order, ensuring all lock pins are in place and
installed properly.