11.8
Installing the fork legs
11.9
Removing the lower triple clamp
SERVICE WORK ON THE CHASSIS 11
Main work
–
Position the fork legs.
Air release screw
the front.
A
Valve
Info
Grooves are milled into the side of the upper end of
the fork legs. The second milled groove (from the top)
H03252-10
must be flush with the upper edge of the upper triple
clamp.
The air suspension is located in the left fork leg. The
pressure and rebound damping is located in the right
fork leg.
–
Tighten screws
Guideline
Screw, top triple
clamp
–
Tighten screws
Guideline
Screw, bottom triple
clamp
V01431-11
–
Position the brake line and clamp. Mount and tighten
4
screws
.
G04201-11
Finishing work
–
Install the front wheel.
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the handlebar cushion.
–
Remove the front wheel.
–
Remove the fork legs.
–
Remove the start number plate. (
–
Remove front fender. (
1
of the right fork leg is positioned to
of the left fork leg faces the front.
2
.
M8
17 Nm (12.5 lbf ft)
3
.
M8
12 Nm (8.9 lbf ft)
(
p. 88)
p. 44)
(
p. 87)
(
p. 46)
p. 52)
p. 52)
47