Lennox DAVE SIGNATURE CBX32MV Manual page 35

R-410a ready - multi-position - variable speed
Table of Contents

Advertisement

STEP 2 -- REFRIGERANT PIPING -- Brazing Procedures
1
PIPING PANEL REMOVAL / PREPARING LINE SET
Remove piping panel to access service valves. Cut
ends of the refrigerant lines square (free from nicks or
dents) and debur the ends. The pipe must remain
round. Do not crimp end of the line.
CUT AND DEBUR
SERVICE VALVE
CONNECTION
COPPER TUBE
STUB
REDUCER
REFRIGERANT LINE
DO NOT CRIMP SERVICE VALVE CONNECTOR
WHEN PIPE IS SMALLER THAN CONNECTION
3
ATTACH THE MANIFOLD GAUGE SET FOR BRAZING
LIQUID AND SUCTION / VAPOR LINE SERVICE VALVES
A. Connect gauge set low pressure side to liquid line service valve (service port).
B. Connect gauge set center port to bottle of nitrogen with regulator.
C. With valve core removed from the suction / vapor line service port, nitrogen flow will have an exit point.
SUCTION / VAPOR SERVICE PORT MUST BE
OPEN AND SERVICE PORT CORE REMOVED
TO ALLOW EXIT POINT FOR NITROGEN FLOW
SUCTION / VAPOR
INDOOR
UNIT
LIQUID LINE
LINE SET SIZE MATCHES
SERVICE VALVE CONNECTION
LINE SET SIZE IS SMALLER
THAN CONNECTION
ATTACH
GAUGES
C
SUCTION /
VAPOR LINE
SERVICE
VALVE
LINE
LIQUID LINE SERVICE
VALVE
FIGURE 4
2
CAP AND CORE REMOVAL
Remove service cap and core from both the suction
/ vapor and liquid line service ports.
SUCTION / VAPOR LINE
SERVICE VALVE
LOW
HIGH
B
OUTDOOR
UNIT
A
Page 7
SERVICE PORT CAP
SERVICE PORT
CORE
LIQUID LINE SERVICE VALVE
SERVICE PORT
CORE
SERVICE
PORT CAP
NITROGEN
XP25 SERIES

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dave lennox signature cbx32mv-036-230-6-01

Table of Contents