General Procedure; Unpacking The Device; Installing The Device In Hazardous Locations - Siemens RUGGEDCOM RSG909R Installation Manual

Hide thumbs Also See for RUGGEDCOM RSG909R:
Table of Contents

Advertisement

Chapter 2
Installing the Device
Section 2.1

General Procedure

The general procedure for installing the device is as follows:
1.
Review the relevant certification information for any regulatory requirements.
For more information, refer to
2.
Unpack and inspect the device.
For more information, refer to
3.
Mount the device.
For more information, refer to
4.
Connect the failsafe alarm relay.
For more information, refer to
5.
Connect power and ground the device.
For more information, refer to
6.
Connect the device to the network.
For more information, refer to
7.
Configure the device.
For more information, refer to
Section 2.2

Unpacking the Device

When unpacking the device, do the following:
1.
Inspect the package for damage before opening it.
2.
Visually inspect each item in the package for any physical damage.
3.
Verify all items are included.
IMPORTANT!
If any item is missing or damaged, contact Siemens for assistance.
Section 2.3

Installing the Device in Hazardous Locations

The RUGGEDCOM RSG909R is designed to comply with the safety standards for Class I, Division 2, Zone 2
hazardous locations where concentrations of flammable gases, vapors or liquids may be present, as opposed to
normal operating environments.
6
Section 6.1,
"Approvals".
Section 2.2, "Unpacking the
Section 2.4, "Mounting the
Section 2.5, "Connecting the Failsafe Alarm
Section 2.6, "Connecting
Section 2.7, "Connecting the Device to the
Section 3.2, "Configuring the
Device".
Device".
Relay".
Power".
Network".
Device".
RUGGEDCOM RSG909R
Installation Guide
General Procedure

Advertisement

Table of Contents
loading

Table of Contents