Download Print this page

Brother GTX600SB Setup Manual page 25

Garment printer
Hide thumbs Also See for GTX600SB:

Advertisement

If supplying from a tank
Fill the tank with pure water.
Use a clean container to supply water to the
tank.
Install the tank about 31.5 in. (80 cm) above the
installation location of the printer.
If the height is insufficient, water may not be
IMPORTANT
supplied to the printer.
The tube should be laid on the floor, and the
length should be 49.2 feet (15 m) or less.
Lay the tube so that there is a height difference
of about 5.9 in. (15 cm).
Limit the number of L-shaped fittings (06-06) to
three per flow path.
Be sure to mount a cable cover with sufficient
strength to the tube.
Water will not be supplied and may leak to the
floor if the tube is broken or cut off.
Lay the tube so that the bending radius is 2.0 in.
(5 cm) or more.
If the bending radius is small, the tube may
break.
If the tube is broken during laying, do not use
the broken part.
Do not use the optional humidifier water supply
IMPORTANT
tube to connect to tap water piping.
Use a new tube.
No water may be supplied if you use a tube with
residual water inside.
Loosen the tank's cap during use.
Verify that the cock is in the closed position
before inserting or removing the tube. Failure to
do so could allow the water to flow out of the
tank.
Check inside the water tank once a month.
Clean inside the tank if you notice any bad odor
or discoloration.
25

Advertisement

loading