Support And Protection Of Pipeline - Lennox VERDB01C432P Installation Manual

Vrf heat recovery distribution boxes
Table of Contents

Advertisement

Cooling and Heating Recovery Mode Exchanger
4) Thermal insulating material of branches should be the same as that of the pipeline. The
attached foam of branches cannot be taken as insulating material.
5) When wrapping the tape, the later circle should cover half of the former one. Don't wrap the
tape too tight, otherwise the insulation effect will be weakened.
6) After wrapping the pipe, apply sealing material to completely seal the hole on the wall.

4.2.6 Support and protection of pipeline

(1) Support should be made for hanging connection pipe. Distance between each support cannot be
over 1m (39-1/4in.).
(2) Protection against accidental damage should be made for outdoor pipeline. If pipeline exceeds
1m (39-1/4in.), a pin. plate should be added for protection.
Schematic diagram of piping connection:
Fig. 4.26
Fig. 4.27
Fig. 4.28
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Verdb02c432pVerdb04c432pVerdb08c432p

Table of Contents