Suspend The Mode Exchanger - Lennox VERDB01C432P Installation Manual

Vrf heat recovery distribution boxes
Table of Contents

Advertisement

Cooling and Heating Recovery Mode Exchanger
VERDB08C432P outline and installation dimension

4.1.2 Suspend the mode exchanger

(1)Drill bolt holes and install bolts
1)Stick the installation template at the installation position flatly, drill 4 holes at the installation
postion basing on the installation template. As shown in fig. 4.9. Please refer to the diameter of
expansion bolt for the diameter of hole with depth of 60-70mm (2-3/8~2-3/4in.). As shown in fig.
4.10.
2)Insert M10 expansion bolt into hole, and then set the iron nail into bolt. As shown in fig. 4.11,
and then remove the paper pattern.
NOTICE ! The length of bolt should be selection according to the height of room. Bolt should be
purchased by the user.
Fig. 4.9
Fig. 4.8
Fig. 4.10
11
Unit:mm (in.)
Unit: mm(in.)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Verdb02c432pVerdb04c432pVerdb08c432p

Table of Contents