Trane E4AH5E24A1J30A Installation Manual page 9

High efficiency air handlers 2-5 ton capacity r-410a txv inside
Table of Contents

Advertisement

2. When installing the air handler lying down, the upper drainage hole is covered the lower left of the
drainage hole is connected with the drainage pipe, the lower right of the drainage hole is connected
with the overflow pipe that should be exposed to the air. lf the pipe ① is draining, which means the
pipe ② is blocked. Contact maintenance personnel as soon as possible.
Figure 3-3 Horizontal right
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E4ah5e36a1j30aE4ah5e48a1k30aE4ah5e60a1k30a

Table of Contents