Trane E4AH5E24A1J30A Installation Manual page 8

High efficiency air handlers 2-5 ton capacity r-410a txv inside
Table of Contents

Advertisement

3.1.1 Installation of drainpipe
1.When the air handler is installed vertically, please block the upper drainage hole with a cover. The
lower right of the drainage hole is connected with the drainage pipe, and the lower left of the drainage
hole is connected with the overflow pipe that should be exposed to the air; lf the pipe ① is draining,
which means the pipe ② is blocked. Contact maintenance personnel as soon as possible.
A
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E4ah5e36a1j30aE4ah5e48a1k30aE4ah5e60a1k30a

Table of Contents