Clearances; Flue/Chimney Location - Baxi 800 Combi 2 Series Installation And Service Manual

High-efficiency wall-hung condensing gas boiler
Hide thumbs Also See for 800 Combi 2 Series:
Table of Contents

Advertisement

Fig.15

Clearances

Fig.16
Flue outlets
Tab.18
Terminal position with minimum distance
Key
Description
Directly below an opening, air brick open­
A
(1)
ing window etc.
Above an opening, air brick, opening win­
B
(1)
dow etc.
5.4.5
A flat vertical area is required for the installation of the boiler and it
should be capable of bearing the weight of the boiler when full of water.
These dimensions include the necessary clearances around the boiler for
case removal, spanner access and air movement. Additional clearances
may be required for the passage of pipes around local obstructions such
as joists running parallel to the front face of the boiler.
In the diagram these are MINIMUM recommended dimensions. Greater
clearance will aid installation and maintenance.
5.4.6
The following guidelines indicate the general requirements for siting bal­
anced flue terminals. For GB recommendations are given in BS 5440 Pt 1.
For IE recommendations are given in the current edition of I.S. 813 Do­
mestic Gas Installations.
J,K
T
N
R
M
I
I
F
L
1
1
Clearances

Flue/chimney location

Important
Due to the nature of the boiler a plume of water vapour will be dis­
charged from the flue. This should be taken into account when sit­
ing the flue terminal.
U
D
A
E
C
I
S
B
F
A
A
G
H
H
I
Flue positions marked
mm
Key
Description
300
J
From a surface or boundary line facing
a terminal
300
K
From a terminal facing a terminal
(Horizontal flue)
From a terminal facing a terminal (Ver­
tical flue)
5 Before installation
I
J,K
require a flue terminal guard.
PN-0000456
mm
600
1200
600
800 Combi 2
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

824 combi 2830 combi 2836 combi 2

Table of Contents