Ricoh A-P3 Service Manual page 20

Table of Contents

Advertisement

6 November, 2001
BRIDGE UNIT INSTALLATION (B397)
[A]
[E]
[B]
B397I402.WMF
[D]
[C]
B397I444.WMF
8. If an optional finisher is to be installed, attach two mylars [A] to the bridge unit.
9. Remove the cover [B].
10. Install the bridge unit [C] (! x 2).
11. Connect the bridge unit I/F harnesses [D] (" x 2).
12. Install the connector cover [E].
13. Turn on the main switch and check the bridge unit operation (make sure that
there are no paper jams).
1-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

G065

Table of Contents