Lennox Allied Air Enterprise A97DSMV Installation Instructions Manual page 48

Warm air gas furnace downflow air discharge direct vent
Table of Contents

Advertisement

Model Number
All Models
Operating Sequence
System
Step
Condition
NO CALL FOR DEHUMIDIFICATION
Normal Operation
1
BASIC MODE (only active on a Y1 thermostat demand)
Normal Operation
1
Dehumidification
2
Call
PRECISION MODE (operates independent of a Y1 thermostat demand)
Normal Operation
1
Dehumidification
2
Call
Dehumidification
1
Call ONLY
• On-board links at indoor unit with a single stage outdoor unit
• With Condensing unit - Cut W914 (R to OS) on integrated control
• With Heat Pump - Cut W914 (R to DS) and W951 (R to O) on integrated control
Page 48 of 73
Allowable Heating Speeds
-15%
-7.5%
Allowed
Allowed
Allowable Circulation Speeds
Model Number
All Models
System Demand
Thermostat
Relative Humidity
Demand
1st
O
G
Status
Stage
On
On
On
Acceptable
On
On
On
Acceptable
On
On
On
Demand
On
On
On
Acceptable
On
On
On
Demand
On
On
On
Demand
Table 24. Cooling Operating Sequence
A97DSMV and Single Stage Outdoor Unit
Default
Factory Setting
Table 22.
38% of Second Stage Cooling
Factory Setting
Table 23.
Compressor
D
24 VAC
High
24 VAC
High
0 VAC
High
24 VAC
High
0 VAC
High
0 VAC
High
Issue 2241
+7.5%
+15%
Allowed
Allowed
System Response
Blower
CFM
Comments
(COOL)
Compressor and indoor
100%
blower follow thermostat
demand
100%
Thermostat energizes Y1
and de-energizes D on a
call for de-humidification
70%
Dehumidification mode
100%
begins when humidity is
greater than set point.
Maximum overcool from
70%
cooling setpoint is 2°F.
Thermostat will keep
70%
outdoor unit energized
after cooling temperature
setpoint has been reached
in order to maintain room
humidity setpoint. Maximum
overcool from cooling
setpoint is 2°F.
507029-05

Advertisement

Table of Contents
loading

Table of Contents