Lennox Allied Air Enterprise A97DSMV Installation Instructions Manual page 40

Warm air gas furnace downflow air discharge direct vent
Table of Contents

Advertisement

Thermostat
DIP Switch 1
1 Heat / 1 Cool
NOTE:
Use DIP
switch 3 to set
sceond-stage heat
ON delay.
OFF - 7 minutes
ON - 12 minutes
1 Heat / 2 Cool
NOTE:
Use DIP
switch 3 to set
sceond-stage heat
ON delay.
OFF - 7 minutes
ON - 12 minutes
1 Heat / 2 Cool
with t'stat with
dehumidification
mode
NOTE:
Use DIP
switch 3 to set
sceond-stage heat
ON delay.
OFF - 7 minutes
ON - 12 minutes
NOTE - Do NOT make a wire connection between the room thermostat L terminal and the L terminal of the integrated control.
Table 14. Field Wiring for Non-Communicating Thermostat Applications
Page 40 of 73
DIP Switch Settings and On-Board Links
W915
(Y1 to Y2)
Two-Stage
Cooling
ON
Intact
ON
Cut
ON
Cut
W914
W951
(DS to R)
(Oto R)
Dehumidification
Heat Pumps
Intact
Intact
Intact
Intact
Cut
Intact
Issue 2241
Wiring Connections
FURNACE
OUTDOOR
T'STAT
TERM. STRIP
H
*
*Not required on all units
FURNACE
OUTDOOR
T'STAT
TERM. STRIP
H
*
*Not required on all units
FURNACE
OUTDOOR
T'STAT
TERM. STRIP
H
o
*Not required on all units
UNIT
UNIT
UNIT
*
507029-05

Advertisement

Table of Contents
loading

Table of Contents