Operation - Dometic NDS IM12-150 Installation And Operating Manual

Battery monitor
Hide thumbs Also See for NDS IM12-150:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
 
No.
Component
1
Display (optional)
2
Control unit
3
Wireless display (optional)
4
Charge controller
5
Solar panel
6
Solar panel
7
Battery charger
8
Inverter
9
House battery 1
10
House battery 2
11
Additional 12 V devices
12
12 V fridge or oven
13
Split-charge relay
14
Starting battery
15
Alternator

8 Operation

NOTICE! Damage hazard
• Do not touch the display with hard or sharp objects. Touch the display with your fingertips.
• Do not apply strong pressure to the display.
• Avoid contact with other electronic devices to avoid generating static discharges.
Note
• Do not touch the display with wet fingers or similar.
• Immediately after installation, the displayed state of charge may be incorrect. After the first use of
the battery this will be corrected automatically by the battery monitor.
Switching the battery monitor on/off
Note The display and the control unit are always switched on or off at the same time.
To switch the battery monitor on, proceed as follows:
Use the on/off button on the control unit (6,
Tap on the display.
Connect a charging source to the battery monitor.
To switch the battery monitor off, proceed as follows:
Use the on/off switch on the control unit (6,
fig. 
on page 10).
fig. 
on page 10).
EN
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nds im12-150w

Table of Contents