Download Print this page

Finalization - A.O. Smith CAWH 8-455-6 Installation, User And Service Manual

Heat pump water heater

Advertisement

Available languages

Available languages

10.4
EN
w
64
7.
Install the service cover.
8.
Install the left side plate.
9.
If necessary, fill the water heater (see 8.7.1).

Finalization

When all maintenance activities are done:
1.
If necessary, fill the water heater (see 8.7.1).
2.
Turn on the water heater (see 4.1).
3.
Check if the performance of all components is correct:
a)
Make sure that the water heater operates the operating cycle correctly.
b)
If applicable, make sure that the T&P valve operates correctly.
Open the T&P valve pressure relief and make sure that water spurts out.
Warning
Hot water can come out of the T&P valve.
c)
Make sure the pressure relief connection of the expansion valve operates
correctly.
Open this pressure relief and make sure that water spurts out.
Installation, Maintenance and Service part

Advertisement

loading

This manual is also suitable for:

Cawh 8-455-9Cawh 8-455-12