Finalization - A.O. Smith BFC Cyclone Installation, User And Service Manual

High efficient condensing water heater
Table of Contents

Advertisement

10.4
88

Finalization

To finalize the maintenance, carry out the following steps:
1.
Fill the water heater (see section 7.8.1).
2.
Start the water heater (see section 4.1).
3.
Check the CO
value (see section 7.8.4).
2
4.
Check the switching pressure of the pressure switch (see section 7.8.5).
5.
Erase the message SERVICE REQUIRED. The displayed message can be reset in
either of two ways:
-
Temporary reset: To postpone the message, press RESET once. The
message will reappear on the display 7 days later.
-
Full reset: To fully reset the message, press and hold both RESET and
ENTER at the same time for 5 sec.
On completion of the full reset of the message, the message below will appear on the
display. This message will NOT be shown after a temporary reset of the message.
Installation, Maintenance and Service part

Advertisement

Table of Contents
loading

Table of Contents