Powering On A 2382 - Nortel 2350 Quick Start Manual

Wlan - security switch 2300 series
Hide thumbs Also See for 2350:
Table of Contents

Advertisement

18
Powering on a 2360/2361
Step
1
2
3
Powering on a 2380
Step
1
2
3
4

Powering on a 2382

Step
1
2
3
4
NN47250-300 (320655-E Version 02.01)
ActionStep
Attach the approved AC power cord to each Power port on the 2360 or 2361 (2 power
ports).
Plug the power cord (s) into the AC power source (s).
The 2360 or 2361 begins booting as soon as you plug in the power cord(s).
On the 2360 ensure that the power supply LED turns green to verify that the power
supply is operating normally. On the 2361 observe each power supply. LED to verify
that both power supplies are operating normally.
Action
Ensure that any removable power supply is fully seated in the 2380.
For each power supply that you are using on the 2380, attach a power cord.
Plug each power cord into an AC power source.
The 2380 begins booting as soon as you plug in the power cord(s).
On each 2380 power supply ensure that the power LED turns green to verify that the
power supply is operating normally. For the 2380 switch, wait a few seconds to verify
that the Mgmt LED is functioning (repeatedly flashing bright green, then fading).
Note: The WSS 2382 runs only on Version 6.0 software and later releases.
Software Versions prior to 6.0 will not run on this hardware.
Action
Ensure that any removable power supply is fully seated in the 2382.
For each power supply that you are using on the 2382, attach a power cord.
Plug each power cord into an AC power source.
The 2382 begins booting as soon as you plug in the power cord(s).
On each 2382 power supply ensure that the power LED turns green to verify that the
power supply is operating normally. For the 2382 switch, wait a few seconds to verify
that the Mgmt LED is functioning (repeatedly flashing bright green, then fading).
End
End

Advertisement

Table of Contents
loading

This manual is also suitable for:

2360236123802382

Table of Contents